Thrifty Banker
  • Politics
  • Business
  • World
  • Investing
  • Politics
  • Business
  • World
  • Investing

Thrifty Banker

Investing

Ongoing Metallurgical Testwork Continues to Improve Hualilan Economics

by May 16, 2024
May 16, 2024
Ongoing Metallurgical Testwork Continues to Improve Hualilan Economics

Challenger Gold (ASX: CEL) (“CEL” the “Company”) reports ongoing metallurgical testwork investigating a potential low-grade zinc concentrate pathway. This program was undertaken to evaluate one of the several clear and material opportunities for improvement of the Hualilan Scoping Study, for inclusion in the Pre-Feasibility Study.

Highlights

Metallurgical testwork has shown zinc (“Zn”) at head grades as low as 0.4% Zn can be economically recovered compared with the 1.5% Zn cut-off grade used in the Scoping Study (“SS”)Potentially unlocks 211.5 kt of Zn1 in the Hualilan Mineral Resource Estimate (above 0.4% Zn cut-off) compared with the 62 kt Zn produced in the Scoping Study mine plan2The testwork produced a Zn 55% concentrate grade compared to 50% Zn concentrate2 grade in previous testwork, which will provide a significant boost to Zn payabilityTestwork produced a simplified flowsheet with lower reagent consumption, potentially reducing operating costsIn addition to Zn recovery, and higher Zn concentrate grades the testwork improved previous results including:increased gold recovery of 97.5% (94.9% in the SS2)increased silver recovery of 93.0% (90.8% in the SS2)anticipated lead recovery of 80-85% (76.8% in the SS2).superior recovery of the Au/Ag into products with the highest Au/Ag payability

Managing Director, Kris Knauer commented on the results

‘We are excited to announce that our latest metallurgical testwork has significantly improved our Hualilan Project. By unlocking the potential to economically recover zinc at head grades as low as 0.4%, we are now able to access 211.5 kt of zinc within the Hualilan Mineral Resource Estimate. This is a substantial increase compared to the 62 kt of zinc initially included in the Scoping Study mine plan.

The testwork also achieved a higher zinc concentrate grade of 55%, which will notably enhance zinc payability. Alongside zinc, we have also seen improvements in gold and silver recoveries, reaching 97.5% and 93.0% respectively. The simplified flowsheet reduces reagent consumption, also has the ability to potential lower our operating costs.

These material opportunities include:

1. The recently confirmed conversion of the Au-Ag concentrate produced by the flotation circuit into doré on site, thereby reducing freight and TC/RC costs and increasing payability.

2. Inclusion of a heap leach, alongside a floatation circuit, to capture value from the low-grade portion of the Hualilan orebody, which was excluded under the low-risk/ high-grade/ low- tonnage scoping study strategy.

3. Re-optimisation focused on a larger open pit case rather than the high-grade/ low-tonnage underground focused Scoping Study strategy given the improved gold price and outlook.

4. Re-optimisation of both the underground and open pit (which was done at a gold price of US$1700) using the materially lower costs and cut-off grades supported by work subsequent to the completion of the Scoping Study.

5. Reduction in the cut-off grade of zinc ore fed into the flotation circuit as outlined in this ASX release.

The results of the testwork investigating the potential lower-grade zinc concentrate pathway support the generation of a simplified flow sheet permitting:

Zn recoveries from material with Zn grades as low as 0.4%;Production of a high-grade Zn concentrate (up to 55% Zn) from this low zinc head grade material, a significant improvement to earlier testwork results;Recoveries of Au, Ag and Pb which outperform the assumptions used in the Hualilan SS.Successful suppression of Au and Ag in the Zn concentrate into other products where payabilities for Au and Ag are significantly higher.Potential reduction in operating costs via the simpler flow sheet with lower reagent consumption.

This metallurgical study provides the potential to unlock a significant proportion of the zinc at Hualilan. Based on flotation test work undertaken prior to the SS, an assumption was used in the Scoping Study that an economic zinc concentrate was only achievable from head grades ≥1.5% Zn. The Hualilan Mineral Resource Estimate (‘MRE’) contains approximately 211.5 kt Zn above 0.4% Zn compared with the 62 kt Zn produced in the SS mine plan which focused on the high-grade core of Hualilan.

This 62 kt of Zn contributed revenue of $US1322million to the overall SS revenue of $US1,1572 million. Thus, the additional zinc recovery has the potential to provide a material increase in the revenue and overall value of Hualilan.

Click here for the full ASX Release

This post appeared first on investingnews.com
0
FacebookTwitterGoogle +Pinterest
previous post
Advisory Board Expansion
next post
East Coast Research Altech Valuation Inches Higher as Analyst Firm adds CERENERGY to Model

Related Posts

Rio Tinto Funding to be Drawn Down by...

December 14, 2023

Canadian North Resources Inc. Awarded an Additional $125,000...

August 19, 2023

Brunswick Exploration Intersects Significant Spodumene Mineralization in Dyke...

December 6, 2023

John Feneck: Gold Due for Sector Rotation, 10+...

October 3, 2023

BMR to Commence Production at Punitaqui Copper Mine...

November 10, 2023

Puma Exploration Intersects Multiple Occurrences of Visible Gold...

August 24, 2023

Uranium Stocks: 5 Biggest Companies in 2024

February 29, 2024

PDAC 2025: Investment Capital, AI Energy Demand and...

March 12, 2025

Omar Ayales: Gold Moves in 7 Year Cycles,...

November 28, 2023

Warriedar Delivers High Grade Gold Extensions at Ricciardo

March 18, 2024

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Popular

    • 1

      Top 10 Countries for Natural Gas Production (Updated 2024)

      April 6, 2024
    • 2

      Understanding Lithium Mineralogy from an Investment Perspective

      September 12, 2023
    • 3

      US Capital Global Facilitates $50MM Financing to Accelerate Charbone Hydrogen’s North American Expansion

      June 6, 2025
    • 4

      Israel confirms it is arming Hamas rivals in operation opposition calls ‘complete madness’

      June 6, 2025
    • 5

      A GOP operative accused a monastery of voter fraud. Nuns fought back.

      January 3, 2025
    • 6

      Crypto Market Recap: Strategy Eyes US$1B Raise for Bitcoin Push, UK Regulator Reverses ETN Ban

      June 6, 2025
    • 7

      China’s aircraft carriers send message in the open Pacific for the first time – and bigger and more powerful ships are coming

      June 16, 2025

    Categories

    • Business (1,056)
    • Investing (2,083)
    • Politics (2,977)
    • Uncategorized (20)
    • World (3,391)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: thriftybanker.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 thriftybanker.com | All Rights Reserved